Excavator on 600 feet Cooling Tower (remote-controlled)

Analog Google AdSene - High payouts, Bonus 5$ for registration
Because a blast was out of the question, the 162 meters high cooling tower of the former Mülheim-Kärlich nuclear power plant was cleared from above with a remote-controlled excavator piece by piece. After falling below a height of approx. 80 meters, a demolition excavator finally brought the cooling tower down from the ground on August 9, 2019.

Due to a faulty building permit procedure, the nuclear power plant was only in operation for about two years.

(A big Thanks to "Einsatzfahrten Rheinland" () for the recording from August 9, 2019!)

▬ Suggested Videos ▬▬▬▬▬▬▬▬▬▬▬▬

Explosive Demolition of Cooling Tower:

▬ More Videos ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Subscribe my Channel:

▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Facebook:
►Twitter:

YouTube圖片

所有圖像從最大到最小
單擊鼠標右鍵並選擇 "保存圖像為..." 將原始圖像下載到您的計算機.

圖片網址:

直接鏈接到圖像與分辨率: 1280x720

直接鏈接到圖像與分辨率: 640x480

直接鏈接到圖像與分辨率: 480x360

直接鏈接到圖像與分辨率: 320x180

直接鏈接到圖像與分辨率: 120x90

從視頻和URL到每個的幾幀:

標題和說明

視頻的說明和標題。
如果字段為空,則視頻沒有描述。
標題:

視頻說明